We try to keep the times that roads are closed down to a minimum so local residents can go about their everyday activities with the minimum disruption.  We will open roads as soon as it is possible and all roads should be fully open by 2pm.  A majority of the roads will be open long before then as we expect to open the roads at the rate of about 15 minutes per mile (approximately) after the start of the race   Full details of all the road closures and opening times are currently being worked on and will appear on this page ASAP

By A Web Design